Upgrade of bottom outlets on Peares Dam, Spain

Engineering, design, manufacture and installation of bulkheads for the construction of a new hydraulic power plant (Gas Natural Fenosa).

Saturation diving techniques and ROV services were utilised to blank two bottom drainage pipelines on an existing concrete dam at a water depth of 90m. (2012)