China Light and Power,
Black Point Power
Station, Hong Kong SAR
The task was
to clean and
repair four
seawater
intake
culverts and
install new
hypochlorite
dosing
lines. Each
culvert is
about 400
metres long,
constructed
from 2.4
metre square
concrete
sections.
The culverts
were thick
with marine
growth and
the concrete
sections had
shifted,
opening up
gaps in the
culvert
walls.
Extended
diving
operations
were only
possible
from the
shoreside
ends. The
work had to
be completed
in two
outages, the
first in
from 1st
November to
31st
December
2003, the
second from
1st
to 31st
January
2004.
Dubai Aluminium
Company, Jebel Ali
Plant, Dubai, UAE
The
refurbishment
of three
steel
seawater
intake
pipelines.
required
the removal
of marine
growth and
old
corrosion
coating, the
removal of
old dosing
line, anodes
and anode
brackets,
re-coating
and the
replacement
of anode
brackets and
anodes. The
intake heads
are to be
replaced
with new
vortex
breakers.
Each
pipeline is
about 400
metres long
and 2 metres
in diameter.