dcndiving
  • Home
  • About
    • Who We Are
    • Vision, Mission & Values
    • Commitment
    • QSHE
    • Our People
    • Our Equipment
  • Services
    • Saturation Diving
    • Diving Services
    • Hyperbaric Welding
    • ROV Support
    • Vessel Supply
    • Engineering
    • Inspection & NDT Testing
    • Survey
    • Creating Dry Space
    • Underwater Concreting
  • Hyperbaric Testing
  • Projects
  • News
  • Careers
  • Contact
  • DCN Shipping
20 oktober 2016
6

DCN Diving charters Normand Baltic

By Peter Ruiter | Geen categorie, Latest News

DCN Diving has entered a long term charter with Solstad Offshore for the DP-2 dive support vessel ‘Normand Baltic’ for subsea duty offshore Middle East and Asia. Read More

15 september 2016
2

Small Cougar eats big work task

By Peter Ruiter | Geen categorie, Our Projects

Cutting off 194 grouting hoses from 97 structures in 24 days, DCN Diving from Bergen op Zoom deployed a compact version of a Saab Seaeye Cougar XT, measuring just 1.3m x 0.78m, for a work task typically undertaken by much larger systems – with considerable savings in costs.
Read More

16 september 2015
3

Gas pipeline repair in the Java Sea

By Peter Ruiter | Geen categorie, Our Projects

At the end of last year, DCN won the largest EPIC contract in the company’s history. Read More

16 maart 2015
1

Construction of new Niederfinow ship’s hoist, Germany

By Peter Ruiter | Geen categorie, Our Projects

Underwater concreting and support during the new hoist. Read More

16 november 2010
0

Underwater concrete for Liefkenshoek Rail Link, Belgium

By Peter Ruiter | Geen categorie, Our Projects

Underwater support and concreting for the Liefkenshoek Rail Link, a new railway tunnel under the River Scheldt in Antwerp. DCN poured over 40,000m3 of underwater concrete (including 17,000m3 steel fibre concrete) in two layers.  Read More

16 september 2016
0

Pipeline rehabilitation GDF Suez Wilhelmshaven, Germany

By Peter Ruiter | Geen categorie, Our Projects

Closing of joints for the cooling water inlet and oulet pipes for the GDF Suez powerplant in Wilhelmshaven. DCN’s self-built Self Propelled Habitats (SPH) will be used to close all joints in the 1.300m long pipes. (2013). Read More

15 september 2016
0

Small Cougar eats big work task

By Peter Ruiter | Geen categorie, Latest News

Cutting off 194 grouting hoses from 97 structures in 24 days, DCN Diving from Bergen op Zoom deployed a compact version of a Saab Seaeye Cougar XT, measuring just 1.3m x 0.78m, for a work task typically undertaken by much larger systems – with considerable savings in costs. Read More

16 september 2015
0

International accolades for DCN

By Peter Ruiter | Geen categorie, Latest News

Ground-breaking welding operations on cracked gas pipeline 27 metres below the java sea while pipeline remained live. Read More

16 september 2014
0

DCN pours first caisson Forth Replacement Crossing

By Peter Ruiter | Geen categorie, Latest News

DCN has poured the first caisson for the new Forth Replacement Crossing. In total it took 1 week from start to finish to pour 7416m3 of concrete. Read More

9 februari 2016
0

Certificate of Great Achievement for DCN

By Peter Ruiter | Geen categorie, Latest News

Early January 2016 DCN International Diving and Marine Contractors has received a Certificate of Great Achievement for a startling welding operation in the Java Sea.

Read More

16 september 2013
0

DCN Divers Rescue Survivor from Jascon 4 (Nigeria)

By Peter Ruiter | Geen categorie, Latest News

On Sunday 26 May, the tugboat Jascon 4 ran into difficulties whilst engaged in static towing operations, capsized and sank with a crew of 12 on board. Read More

16 februari 2013
0

Saturation Diving NPDC 16” Pipeline Replacement, Nigeria

By Peter Ruiter | Geen categorie, Our Projects

DCN Global and Nigerian partner ADS have been awarded the saturation diving contract for the NPDC – Okpoho-Okono 16” Pipeline Replacement Project in Nigeria, by contractor West African Ventures. Read More

16 oktober 2012
0

SPM inspection and maintenance program, UAE

By Peter Ruiter | Geen categorie, Our Projects

Pre-commissioning monthly and routine subsea inspections and repairs to 3 SPMs offshore Fujairah until such a time the project is completed and goes on line. Read More

16 oktober 2012
0

Upgrade of bottom outlets on Peares Dam, Spain

By Peter Ruiter | Geen categorie, Our Projects

Engineering, design, manufacture and installation of bulkheads for the construction of a new hydraulic power plant (Gas Natural Fenosa). Read More

20 september 2012
0

Borkum West offshore wind farm installation, Germany

By Peter Ruiter | Geen categorie, Our Projects

Subsea support, including diving equipment and underwater installation machinery, for the first phase of a major wind farm project. Read More

18 september 2012
0

Forth Road Crossing Bridge underwater foundation construction, Scotland

By Peter Ruiter | Geen categorie, Our Projects

Underwater concreting and subsea support for the construction of the foundations of the new cable-stayed bridge being built to replace the Forth Road Crossing. The bridge is to be 2.7km long. (2012) Read More

18 september 2012
0

Pile removal in Tanajib Harbour, Saudi Arabia

By Peter Ruiter | Geen categorie, Our Projects

Removal of piles for the construction of a new shipping channel. Supply included engineering and design, personnel and equipment (2012). Read More

16 september 2012
0

Underwater foundation construction for Söderström Tunnel, Sweden

By Peter Ruiter | Geen categorie, Our Projects

Underwater concreting and subsea support for the construction of the foundations of the new Söderström Tunnel in Stockholm. (2012) Read More

16 september 2012
0

Habitat repairs to Kattendijksluis shiplock, Belgium

By Peter Ruiter | Geen categorie, Our Projects

Repairs to the lock, which is located in Antwerp, involving the design and supply of two cofferdams and a habitat. (2012) Read More

16 september 2012
0

Habitat repairs to Wilhelmshaven quay wall, Germany

By Peter Ruiter | Geen categorie, Our Projects

Repairs to the quay wall of the new deepwater harbour involving 4 custom designed and manufactured welding habitats. Read More

© 2017 dcndiving.com. All Rights Reserved, DCN Diving B.V.

  • Home
  • About
    • Who We Are
    • Vision, Mission & Values
    • Commitment
    • QSHE
    • Our People
    • Our Equipment
  • Services
    • Saturation Diving
    • Diving Services
    • Hyperbaric Welding
    • ROV Support
    • Vessel Supply
    • Engineering
    • Inspection & NDT Testing
    • Survey
    • Creating Dry Space
    • Underwater Concreting
  • Hyperbaric Testing
  • Projects
  • News
  • Careers
  • Contact
  • DCN Shipping